Sunday, January 20, 2013 0 comments

Wikipedia featured the TEAM - KIIT 3-D Model



While it's a cumbersome process to submit your article , and get accepted by wikipedia  ( http://en.wikipedia.org/wiki/Baja_SAE )as a highly experienced team of about 10-20 people review it (the thing is, it has only 73 members all over the world :) , and then finally you got an-email that your team Model has been accepted to be featured on wikipedia
Visit the page http://en.wikipedia.org/wiki/Baja_SAE
File:3D CAD Model BAJA SAE TEAM KIIT.jpg
 Currently there are about 300-400 models and pictures ( http://commons.wikimedia.org/wiki/Category:Baja_SAE )  waiting in line to be displayed on BAJA main article . ....
It's really a proud moment for me as well as my team .
Kudos .
TEAM-KIIT
0 comments

Monster at Run

0 comments

TO DO LIST 20th January

TO DO LIST-date : 20th jan. 
1.Hitch Point (front & rear) - manufacturing & mounting completion Rohit Manglik
2.Chain alignment - Abhishek Upadhyay Mukesh Singh
3.Pedal assembly 
4.Throttle stop
5.Head restraint and padding of seat- Narendra Kumar
6.All sharp edges which might endanger the driver, crew, or officials, including "the Wraps", must be eliminated, shielded or radiused. Rohit Rastogi
7.Kill switch mounting
8.brake and reverse light mounting
9.speedometer mounting
10.Fire extinguisher & its mounting Irfan Ahmad
11.Firewall modification as per requirement n discussed - @rohit manglik
12. covering of steering components - Abhishek Singh n rohit manglik
13. side panels
14.engine rpm adjustment n CVT tuning
15.completion of spill prevention
16.Proper routing of brake lining
17.Number paltes (though needed before going to final event , it may be completed as of now)
18. Weld confirmation test (2 samples each) - in our lab . Manish KanwalParakh Kumar Ankit Shaw (complete it by today any how)
19. checking of all fasterners (min 8.8 grade)

0 comments

Section 2 Vehicle Requirements and Restrictions

 2.1 Vehicle Configuration:
The vehicle must be capable of carrying one (1) person 190.3 cm (6'3") tall weighing 113.4 kg (250 lb).

       2.1.2 Maximum Vehicle Dimensions
         Width : 162.56 cm (64 in) at its widest point: Mandatory
         Length : 274.32 cm (108 in) end to end: Recommended

2.2 Required Engine

       2.2.1 Briggs and Stratton Engine: 10 hp OHV Intake.

2.3 Engine Requirement and Restrictions
 
       A fresh air cleaner element & paper filter are required during On-site Technical Inspection-Engine at       BAJA SAEINDIA 2013.
    Starter
The Recoil Starter Rope may be extended to accommodate the driver starting the engine while being seated.
Electric start is not acceptable in any case even if it is from B&S standard parts.

2.3.16 Energy Storage Devices Used for Propulsion
Hydraulic accumulators are the only type of stored energy device that may be incorporated into the vehicle for propulsion purposes. If employed, hydraulic accumulators must be at zero energy at the start of each event.
Hydraulic power systems must be properly shielded and documentation of the shielding made available for review.

2.12.2 Transponder Mounting

One transponder will be provided to each team during the endurance event at no cost for the event
purpose. This is essential to use for endurance event for counting the laps during endurance run. The team captain is responsible for returning it, at the end of endurance run. It is the team captain’s responsibility to design a secure and safe mounting for the transponder at given location and acceptable method.
Mounting bracket of sheet metal box of size 55 x 45 x 20mm to be attached/ weld from outside of SIM on Right side of vehicle.



Each transponder as shown (Figure 5) is supplied on the last day of endurance event. However Teams are advised to make a provision of box weld / attached of sheet metal /fiber /plastic of size 55 x 45 x 20 mm on Side Impact Member of frame.
Attaching the bracket with M4/M6 size with Pan / Flat head bolts with lock nuts or fix by strong wire is suggested.The transponder mounting requirements are:
The provision for fitment of transponder is essential to fix it in right position so that it does not come out due to bumps or shaking of vehicle. It’s essential to ensure the signal transmitted by transponder is read by timing
system, so that the purpose of counting laps is not be defeated.
(1) Orientation - The bracket must be mounted vertical to the frame.
The transponder must be mounted on the driver’s right side forward of the seat
(2) Location –no more than 61 cm (24 in.) above the track.
(3) Unobstructed –No obstruction between the antenna on the bottom of the transponder and the ground.
Metal and carbon fiber may interrupt the transponder signal. The signal will normally transmit through
fiberglass and plastic hence it is advice to use it. However if sheet metal box is used it should have cut out
10.2mm (0.4 in.) diameter opening from sensor side.
(4) Protection – Mount the transponder where it will be protected from obstacles.



      
     


Monday, January 14, 2013 0 comments

Steering axis explained




                                            




Sunday, December 30, 2012 0 comments

BAJA -SAE India Rule Book 2013


CONTENTS
Section 1 General Information
Section 2 Vehicle Requirements and Restrictions
Section 3 Roll Cage, Systems and Driver’s Equipment Requirements
Section 4 Competition Procedures and Regulations 26
Section 5 Technical Inspection 28
Section 6 BAJA SAEINDIA Events 31
Section 7 Appendices 37
Appendix 01- Roll Cage Specification Sheet 37
Appendix 02- Local Technical Inspection Rules 38
Appendix 03- Code of Conduct 39
Appendix 04- Virtual BAJA SAEINDIA 40
Appendix 05- Design Report Format 42
Appendix 06- Cost Report Format 43
Appendix 07- Index Sheet for Process Cost Reference 45
Appendix 08- Static Event Participation Sheet 46
Appendix 09- BAJA SAEINDIA 2013 Scoring 47
Appendix 10- BAJA SAEINDIA 2013 Awards 48
Appendix 11- BAJA SAEINDIA 2013 Penalty Structure 49
Appendix 12- BAJA SAEINDIA 2013 Contacts 50
0 comments

General Information (BAJA-Rule Book 2013)





  1. Proof of manufacturing location will be essentially required to be furnished by the teams on-site upon being so asked for by the officials.



Automobile Workshop
Department of Mechanical Engineering
2. Only those teams, whose management gives an undertaking to allow them to use the workshop facilities, would be allowed to participate without exception.

3. Teams need to submit a list of facilities / equipments in operating condition with the college facilities which will be used to fabricate & assemble the vehicle as per design presented in virtual BAJA event.

Get the doc here

4.During the actual manufacturing and fabrication process, the video clips that covers students working in
college facility need to be furnished in CD-Format during the College Level Technical Inspection.


Wiil be uploaded soon


5.


 
;